Hong Lok Yuen

Description
Balcony Waterproofing
Completion
December xxxx
Location
Hong Lok Yuen, Tai Po
Contract Sum
HKD$ HK$ xxx,xxx
Area
xxxx 平方米

Part A: Concrete surface preparation

1. Smoothing even area and scratches using patching mortar

2. Cleaning and drying of the smoothened concrete surface.

3. Removal of any “spikes” from the concrete / screed


Part B: Basement waterproofing system (3,500ft2)

1. Apply ARDEX WPM 300 as the primer

相关产品

0
    0
    Your Cart
    Your cart is emptyReturn to Shop

    现在订阅断水流电子报可以获得首单九折优惠!

    获取独家资讯

    限时优惠

    聯絡客服
    線上客服
    斷水流線上客服
    您好,感謝您聯絡斷水流,請問閣下有咩滲水問題?有無相片可提供師傅參考?

    我們的客服會儘快回覆及處理你的查詢。

    Hi! Thank you for reaching Master Lau. We will get back to you as soon as we can.