Villa, The Peak

Description
Basement Waterproofing
Completion
December xxxx
Location
Villa, The Peak
Contract Sum
HKD$ HK$ xxx,xxx
Area
xxxx sq meters

Part A: Concrete surface preparation

1. Smoothing even area and scratches using patching mortar

2. Cleaning and drying of the smoothened concrete surface.

3. Removal of any “spikes” from the concrete / screed


Part B: Basement waterproofing system (3,500ft2)

1. All joints and inner corners are protected with angle fillet and web.

2. Apply first layer of ARDEX WPM 300 @ 1mm

3. Apply second layer of ARDEX WPM  300 @1mm to achieve 2mm waterproofing membrane.