Bowen Mansion

ARDEX Sheltercoat as Waterproofing layer. Contractor Partner: Hip Lee Professional Engineering Limited

Jade House

ARDEX WPM 300 as the primer. ARDEX Sheltercoat (Grey) as the main waterproofing layer. 地磚夾口較深,需要特別壓坑處理,否則防水層會離底。 Contractor Partner: Hip Lee Professional Engineering Limited

Yip Cheung Centre

Rooftop waterproofing reconstruction – Using ARDEX Shelterbit 3mm as the main waterproofing material. – Apply insulation tile on top of the sheet membrane – Apply ARDEX Shelterbit 4mm to the parapet wall

Shek Wu Hui Municipal Services Building

Rooftop waterproofing reconstruction – Using ARDEX Sheltercoat 157 as the main waterproofing material. – Direct spray of Sheltercoat 157 on the existing tiles.

Tai Ping Industrial Centre

Scope: – Using ARDEX WPM 300 as the main waterproofing material. – Apply insulation tile on top of the sheet membrane – Apply ARDEX Shelterbit 4mm to the parapet wall

Sha Tin Racecourse Horse Stable

Rooftop waterproofing reconstruction – Using ARDEX WPM 300 as the main waterproofing material.

Kader Building

Rooftop waterproofing reconstruction – Using ARDEX WPM 300 as the main waterproofing material.

Kowloon Rhenish School

Rooftop waterproofing reconstruction – Using ARDEX WPM 300 as the main waterproofing material.

South Eastern House

1. Internal Crack Repair: Removal of existing concrete crack and repair by waterproofing mortar. 2. Cleaning of rooftop and construction of water outlet 3. Floor screed reconstruction and levelling. 4. 3”Floor screed for closets 5. Rooftop waterproofing layer construction using ARDEX WPM 300 as primer and ARDEX Sheltercoat as body coat

Villa on Mount Kellett Road

Waterproofing works: – Apply ARDEX WPM 300 directly on rooftop tiles. – After drying, apply ARDEX Sheltercoat as the main body coat.